Downloads

Pre-launch_lab_equipment_check.jpg
Checking equipment in the Argus ship lab before the launch
Kirschner_in_lab5_-_small_02.JPG
Working in the Argus ship laboratory
Paunovic_cleaning_mussels.jpg
Cleaning mussels taken from the river
Stadler__Schwarz_and_Kraier_studying_hydromorphology_maps.jpg
Studying maps of river hydromorphology
Morning_on_Serbian_side_of_Danube_in_Backa_Palanka.jpg
Day break for JDS2 in Serbia
Argus_at_Melk_AT.jpg
Argus ship on the Danube at Melk, Austria
Eichhornia_crassipe_2_-_small.jpg
Eichhornia crassipe
Mussels_from_bottom_sediments.jpg
Mueesl from river bottom sediment

JDS2 Final ResultsJDS2 Final Results

On September 11, 2008, the final results of the JDS2 expedition were publicly presented during a press conference at the `World Water Congress and Exhibition´ in Vienna, Austria. They show that the Danube and its tributaries are becoming cleaner, but measures to reduce particular pressures are needed.

Journalists may use the photos presented here for their media purposes. Click onto the photo to get the full-sized image.

For more detailed results from the JDS2, please download our JDS2 Publications.

Similar entriesSimilar entries

  • The following photos are available for use by the media regarding the JDS2 press conference and event in Vienna, Austria on August 20. For full-size photos, click onto the image.
  • On September 27, a final press conference was held in Tulcea, Romania. A final press release marking the end of the JDS2 was distributed internationally on September 28.
  • The following photos are available for use by the media regarding the JDS2 press conference and event in Regensburg, Germany on August 14.
  • The following photographs represent some of the best photos taken so far on the expedition, about the scientists at work.

  • The following photographs represent some of the best photos taken so far on the expedition, about the ships and crew.For a full-size photo, first click